Plan Room

Current Jobs out for Bid!

Note: Please enter your Search Terms as needed.

Search Zip: Radius: State: Search  
Project Info
Town of Rock River Raw Water Transmission Line and Tank to Town Transmission Lines - Rock River, WY 82083 - Bids Due: 06/25/2019 02:00 PM
Proposed installations are to be located at two separate sites, but in the same vicinity. The first (drinking water section) will consist of 1.7 miles of dual 12” PVC C900 pipes, approximately 495 feet of 16” PVC C905, and 155 feet of 16” HDPE pipe with all fittings and related appurtenances. This section of waterline replacement will also consist of utilizing an existing bore under State Highway 13, installing a new bore under Highway 13, placing pipe through an existing bore under the Union Pacific Railroad (UPRR), and constructing a new bore under the UPRR. The second pipeline replacement section (raw waterline portion) will consist of replacing 2 miles of 8” diameter PVC C900 pipe with all fittings and related appurtenances. This project is funded by the Town of Rock River. Bids will be received up until 2:00 p.m., on Tuesday, June 25, 2019, at the Rock River Town Hall, 321 Avenue D (P.O. Box 280 if mailing USPS), Rock River, Wyoming, at which time they will be publicly opened and read aloud. Plans and specifications were prepared by Sunrise Engineering, Inc. and are available online at www.sunrise-eng.com. Call (307) 775-9500 for questions. A mandatory pre-bid meeting and site walk will be held Tuesday, June 11, 2019 at 2:00 p.m. at the Rock River Town Hall.
Minidoka Irrigation Dist. Acequia Main Check Structure Replacement - Rupert, ID 83350 - Bids Due: 06/07/2019 03:30 PM
Replace an existing gate structure with a new check structure containing three 14’ radial gates and three 5’ slide gates.
Town of Pine Bluffs Phase I Sanitary Sewer Improvements Project - Pine Bluffs, WY 82082 - Bids Due: 05/29/2019 2:00
Improvements will include replacing the entire lift station package at the east location including pumps, control panel, above ground submersible valve package, enclosure, and piping inside of the wetwell at the east lift station. The existing wetwell and forcemain into the wetwell will remain. Adding a flow meter is also included with the east lift station work. The north lift station will include the addition of a mechanical bar screen, screenings washing dewatering press, concrete channel structure, a fiberglass enclosure, fencing improvements, concrete work, and miscellaneous piping. Portions of the north lift station improvements will be owner supplied. Contractor may choose to submit on Bid Schedule No. 1 (East Lift Station), No. 2 (North Lift Station), or No. 3 (Both the East and North Lift Stations).
Panguitch City Springs Redevelopment Project – 2019 - Panguitch, UT 84759 - Bids Due: 05/23/2019 02:00 PM
Redevelopment of the six Panguitch City springs that were destroyed as a result of the Brian Head Fire and subsequent floods, and replacement of approximately 6,700 feet of spring transmission pipelines.
Town of Afton 2019 Street Improvement Project - Afton, WY 83110 - Bids Due: 05/23/2019 01:00 PM
Work to consist of full depth pavement reclamation for up to 9,500 square yards of 2” and 3” asphalt in One block sections. Work will also include 24,000 square yards of single coat chip seal and approximately 2.5 tons of crack sealing.
Moroni City Emergency Water Line Replacement - Moroni, UT 84646 - Bids Due: 05/06/2019 11:00 AM
Replacement of three 450 foot long sections of water main below the City’s lower water tank. The line sizes are 8”, 10” and a 12” diameter line. Some solid rock excavation is expected. There will also be a small section of 6” waterline and a gate valve.
Pine Bluffs Phase I Sanitary Sewer Improvements - Pine Bluffs, WY 82082 - Bids Due: 04/10/2019 2:00 pm
Sanitary sewer improvements to include replacing the entire lift station package including pumps, control panel, above ground submersible valve package, enclosure, and piping inside of the wetwell at the east lift station. The existing wetwell and forcemain into the wetwell will remain. The north lift station will include the addition of a mechanical bar screen, screenings washing dewatering press, and piping to allow for the use of the existing grinder or screen, or the combination of both.