Plan Room

Current Jobs out for Bid!

Note: Please enter your Search Terms as needed.

Search Zip: Radius: State: Search  
Project Info
Boulder Rearing Station - Boulder, WY - Bids Due: 10/04/2019 10:00 AM
Interested Bidders, On the public purchase website, the Wyoming Game and Fish is advertising a pump station and piping near Boulder Wyoming. The project has some pipe and earthwork, but is mostly a wetwell and building to pump flood water and hatchery effluent. Its official name is the Boulder Rearing Station Flood Control Project. The estimated project cost is $700,000 to $800,000. Sunrise designed the project and the State is handling the bid on the public purchase website. If you are interested, below is a link. You will need to login to the public purchase website and create a password. https://www.publicpurchase.com/gems/wyominggsd,wy/bid/bidView?bidId=117348
Dry Creek Irrigation Line Replacement Phase II - Ln 4 and Ln 5 - Afton, WY 83110 - Bids Due: 09/26/2019 11:00 AM
Irrigation Line Replacement (approx. 14,000 feet)
Cow Lane Gate/Houwelings MSA - Phase 1 & 2 - Nephi, UT 84648 - Bids Due: 09/25/2019 02:00 PM
The work to be performed under this project shall consist of furnishing all labor, materials and equipment required to construct the facilities and features called for by the CONTRACT DOCUMENTS and as shown on the DRAWINGS. All Work associated with this Project shall be in accordance with all applicable Federal, State, County and City requirements. Selected Contractor will be required to submit an Operator Qualification (OQ) plan that meets the requirements in CFR part 192 and part 195 and have in place a DOT approved drug and alcohol plan. Contractor must provide personnel that are qualified or can be qualified to perform the Covered Tasks associated with this project. Phase one of the Cow Lane Gate/Houwelings MSA Project will be limited to a natural gas gate station, metering and regulating station, and pipeline construction. The City of Nephi (City) intends to install approximately 50 ft. of 3-inch and 550 ft. of 8-inch high pressure natural gas transmission main from an existing 3-inch transfer flange located in Dominion Energy’s gas yard at the Rocky Mountain Power Currant Creek plant near Mona, UT to a new gate station just north of Houweling’s Tomatoes’ green houses. A separate 150 ft. 4-inch high pressure distribution main will run from the new gate station to a new metering station for Houweling’s Tomatoes just west of the new gate station. Phase two of the Cow Lane Gate/Houwelings MSA Project will include installing natural gas 8-inch steel high pressure distribution line from the phase one gate station down to a proposed valve yard near the intersection of Old Hwy 91 and 200 N in Mona City, and then hot tap into a nearby existing 8-inch high pressure steel pipeline. This pipeline will involve installing approximately 11,000 ft of pipe, directional drill of approximately 830 ft. under a creek, a 100 ft. bore under a railroad, construction of a small valve yard, and an 8-inch steel hot tie-in.