Town of Afton 2019 Street Improvement Project - Afton, WY 83110 - Bids Due: 05/23/2019 01:00 PM
Work to consist of full depth pavement reclamation for up to 9,500 square yards of 2” and 3” asphalt in One block sections. Work will also include 24,000 square yards of single coat chip seal and approximately 2.5 tons of crack sealing.
Moroni City Emergency Water Line Replacement - Moroni, UT 84646 - Bids Due: 05/06/2019 11:00 AM
Replacement of three 450 foot long sections of water main below the City’s lower water tank. The line sizes are 8”, 10” and a 12” diameter line. Some solid rock excavation is expected. There will also be a small section of 6” waterline and a gate valve.
Pine Bluffs Phase I Sanitary Sewer Improvements - Pine Bluffs, WY 82082 - Bids Due: 04/10/2019 2:00 pm
Sanitary sewer improvements to include replacing the entire lift station package including pumps, control panel, above ground submersible valve package, enclosure, and piping inside of the wetwell at the east lift station. The existing wetwell and forcemain into the wetwell will remain. The north lift station will include the addition of a mechanical bar screen, screenings washing dewatering press, and piping to allow for the use of the existing grinder or screen, or the combination of both.
Hildale City - Utah Avenue Safe Routes to Schools - Hildale, UT 84784 - Bids Due: 04/01/2019 10:00 AM
The project consists of demolition, ADA ramps, curb and gutter, sidewalk, and driveways along Utah Avenue from Lauritzen Street to Carling Street.
La Verkin City - Main Street Safe Routes to Schools - La Verkin, UT 84745 - Bids Due: 03/15/2019 10:00 AM
The project consists of demolition, signs, ADA ramps, curb and gutter, sidewalk, and fencing along Main Street from Center Street to 500 North.
Moroni City Safe Route to School 2019 - Moroni, UT 84646 - Bids Due: 03/07/2019 10:00 AM
The project includes the construction of approximately 6,000 lineal feet of city sidewalk and related excavation, grading, and concrete work.